首页Home/工程案例Projects/从服务中核到牵手印尼国家石油:装备制造的“隐形冠军”路径From CNNC to Pertamina: how the equipment line was built
2026-05-10 · CNNC and other industrial users
从服务中核到牵手印尼国家石油:装备制造的“隐形冠军”路径From CNNC to Pertamina: how the equipment line was built
以核电与工业气体项目积累的制造与文件体系,支撑海外国家石油公司的验收标准。Manufacturing and documentation discipline from nuclear and industrial gas projects underpins overseas acceptance.

01 / Scope
供货与实施范围Scope of supply
- 压力管道元件制造(TS2713287-2027)Pressure piping components (TS2713287-2027)
- GC2 级工业管道安装(TS3813652-2027)GC2 piping installation (TS3813652-2027)
- 厂内试验与文件交付体系In-house testing and documentation
02 / Data
项目参数Project data
| 制造许可Manufacture licence | TS2713287-2027TS2713287-2027 |
|---|---|
| 安装许可Installation licence | TS3813652-2027(GC2)TS3813652-2027 |
| 设计压力上限Design limit | 27.5 MPa27.5 MPa |
| 纳税信用Tax credit | A 级(2019 年起连续)Grade A since 2019 |
03 / Timeline
实施节点Milestones
积累
核电与工业气体项目锻炼制造与文件能力Nuclear and gas projects build discipline
认证
制造与安装双许可换证通过Dual licences renewed
出海
印尼国家石油公司两套撬一次验收Two skids accepted by Pertamina
有类似工况?A similar duty?
把介质、流量、进出口压力和场地条件发给我们,按项目出方案与报价。Send medium, flow, pressures and site conditions for a project proposal.